Donja Dobra, production facility/sawmill with a silo and a series of buildings, located on a 17,210 m² plot.
The facility includes a production hall, drying room, boiler room, maintenance workshop, enclosed storage area, and an administrative building. Occupancy permits have been obtained. This modern construction, in semi-finished condition, allows for setting up spaces for employees, expanding production, and extending the product range to meet the growing demand for finished products. If the new owner desires, a collapsed building on-site can also be restored for production use.
A separate silo building is connected to the production hall for storing sawdust.
For production process needs, a 325 KW supply and network usage contract has been signed with HEP.
The Dobra River runs adjacent to the location, and the facility is situated in a forested area, with comparative advantages being the proximity to the highway, isolation from residential areas, and a fully equipped sale with all machinery and vehicles. The sawmill is operational, and maintenance of the facility is ongoing.
The published price does not include VAT.